Feasibility Study - Stage 3

The Feasibility Study is now complete. Stage 3 took the results of Stage 2 through further refinement to select a single preferred option.  A deeper study of the sustainability issues and examination of the socio-economic benefits of the candidate schemes were performed by the project team.

Feasibility Study Reports

The Feasibility Study has been completed. The findings have been brought together in the main Feasibility Study report with additional detail provided in the supporting reports. You can download them by clicking on each of the report titles below:

  • Feasibility Study - Main Report
  •  

    Technical Reports 
  • Civil Engineering (Power)
  • Development of Scheme Options
  • Sustainability
  • Marine Ecology
  • Socio-Economic Impacts
  • Navigation Options
  • Landside Facilities
  • Cost Management
  • Financial Modelling
  •  

    Feedback on the reports is welcomed. Your comments, together with your full contact details, should be sent to:

    Anthony Hatton
    Peel Energy
    Peel Dome
    The Trafford Centre
    Manchester M17 8PL
    or email to: energy@peel.co.uk

    The closing date for the receipt of responses is 5th August 2011.